Cajon del Maipo/ Embalse el Yeso & Viña Concha y Toro

1 day
Instant confirmation
About this activity
Itinerary
This is a typical itinerary for this product

Stop At: Tunel Ferroviario del Tinoco, Camino Al Volcan, San Jose de Maipo Chile

The railway had a narrow 600-mm track, and was built in 1906 by the Chilean government. Each section was inaugurated as it was completed: March 1, 1910 (between Puente Alto and El Canelo); in 1911 (between El Canelo and El Peachotón); and on June 9, 1914 (between El Melocotón and El Volcán). The railroad rema

Duration: 15 minutes

Included
  • Snacks
  • Wine tasting
  • Vineyard entrance fee
  • Entry/Admission - Tunel Ferroviario del Tinoco
Additional
  • Confirmation will be received at time of booking
  • No heart problems or other serious medical conditions
  • Not wheelchair accessible
  • Minimum drinking age is 18 years
  • May be operated by a multi-lingual guide
  • This tour/activity will have a maximum of 15 travelers
Features
Tourism
95% Cultural
75% Food
20%